projects

  • Construction site with a large concrete foundation, construction vehicles, and dirt piles, with industrial buildings in the background.

    Fort Gillem Redevelopment

    A 556-acre former military base transformed over 12+ years into a thriving industrial campus — 11 buildings totaling 6 million square feet, supported by 3 million cubic yards of earthwork and 180,000 linear feet of pipe infrastructure.

  • An aerial view of a large building under construction on a dirt lot, with construction vehicles and equipment, surrounded by greenery and open land, and roads nearby.

    Allatoona Business Park

    This 108-acre industrial distribution hub required moving over 2 million cubic yards of dirt, blasting 870,000 cubic yards of rock, and installing 29,000 linear feet of pipe across 5 building pads.

  • Construction site with cleared and excavated land, dirt roads, and construction equipment, adjacent to a paved road and surrounded by trees.

    Englewood

    A City of Atlanta Housing Authority mixed-use infrastructure project involving 115,000 cubic yards of earthwork and 20,000 linear feet of pipe in the heart of Atlanta.

  • Stonemont Park 75

    Stonemont Park 75

    Three industrial building pads totaling 900,000 square feet across 67 acres, supported by 375,000 cubic yards of dirt movement and 36,000 linear feet of pipe.

  • Chattahoochee logistics

    A 73-acre industrial development anchored by a 1 million square foot building pad, requiring 1,190,000 cubic yards of dirt movement and 22,000 linear feet of pipe.

  • Oakgrove Athens

    A 46-acre mixed-use project in Athens, supported by 300,000 cubic yards of earthwork and 26,000 linear feet of pipe.

  • Friendship Road

    Four industrial building pads totaling 650,000 square feet across 67 acres, built on 635,000 cubic yards of dirt movement and 30,000 linear feet of pipe.

  • Garland Gables

    A 151-lot residential community spanning 51 acres, supported by 246,000 cubic yards of earthwork and 31,000 linear feet of pipe.

  • Agile Cold Storage

    A 19-acre cold storage facility in Gainesville, requiring 106,500 cubic yards of dirt movement and 6,000 linear feet of pipe.

  • Project Tiger

    An 83,000 square foot industrial building on 16 acres in Hayesville, featuring 100,000 cubic yards of earthwork, 35,000 square feet of retaining walls, and 40,000 square feet of lime-treated fill.